Start / Publications / tunnel - Offizielles Organ der STUVA

tunnel - Official Organ of the STUVA

International journal for underground construction

As a technical, practice-oriented journal, tunnel is dedicated to the construction and planning as well as the research, the technical equipment, the maintenance and the rehabilitation of underground structures.
tunnel is published in two languages: English and German, all articles are translated and reproduced in their entirety. The magazine is, adapted to the current construction, distributed internationally. The "official organ" of the STUVA is connected to the IVW circulation control tunnel.

  • Target group: Civil engineers (planning) · Bauunternehmer · Tunnelbauingenieure
  • Frequency: 6 times a year
  • Circulation: 4.500

STUVA members benefit from a reduced subscription price! 

Go to online edition


Contact person
Dipl.-Bibl. Martin Schäfer
STUVA e.V.
+49 221 59795-34
+49 221 59795-50